Construction Investments and Work Backlog by Type and Canton

This table provides data on construction investments for 2021 and the work backlog for 2022 across various Swiss cantons and regions. It distinguishes between civil engineering (Tiefbau) and building construction (Hochbau). Measures include total value in millions of Swiss francs, percentage change from the previous year, and the share of the total.

This table is useful for analyzing regional trends in the Swiss construction industry and comparing civil engineering versus building construction. It does not provide a breakdown of specific project types (e.g., residential vs commercial) or data for years other than 2021 and 2022.

33 rows · 13 columns · published by Federal Statistical Office · licence: Open use, source must be named

Source file: https://www.bfs.admin.ch/asset/de/je-d-09.04.01.27 · the dataset

Columns

ColumnTypeDescription
PlacePLACEThe Swiss canton or region name.
Civil Eng. Investments 2021 (Mio CHF)FLOATInvestment value for civil engineering in 2021, in millions of Swiss francs.
Civil Eng. Inv. Change 2021 (%)FLOATPercentage change in civil engineering investments compared to the previous year.
Civil Eng. Inv. Share 2021 (%)FLOATThe share of civil engineering investments relative to the total for 2021.
Civil Eng. Backlog 2022 (Mio CHF)FLOATValue of the work backlog for civil engineering in 2022, in millions of Swiss francs.
Civil Eng. Backlog Change 2022 (%)FLOATPercentage change in the civil engineering work backlog compared to the previous year.
Civil Eng. Backlog Share 2022 (%)FLOATThe share of the civil engineering work backlog relative to the total for 2022.
Building Inv. 2021 (Mio CHF)FLOATInvestment value for building construction in 2021, in millions of Swiss francs.
Building Inv. Change 2021 (%)FLOATPercentage change in building construction investments compared to the previous year.
Building Inv. Share 2021 (%)FLOATThe share of building construction investments relative to the total for 2021.
Building Backlog 2022 (Mio CHF)FLOATValue of the work backlog for building construction in 2022, in millions of Swiss francs.
Building Backlog Change 2022 (%)FLOATPercentage change in the building construction work backlog compared to the previous year.
Building Backlog Share 2022 (%)FLOATThe share of the building construction work backlog relative to the total for 2022.

Questions it answers