This table lists validated water management actions implemented by the Cantonal Office of Water in Geneva. Each row represents a specific action, detailing its objective, planning type (such as SPAGE, PREE, or PGEE), responsible party, estimated cost in CHF, and implementation status. The data covers various municipalities and water basins within the canton, with adoption dates ranging from 2012 to 2023.
This table is useful for tracking the progress and budget of water-related infrastructure and environmental projects in Geneva. It provides a high-level overview of validated actions but does not contain detailed technical blueprints or real-time daily progress reports.
2,546 rows · 20 columns · published by Office cantonal de l'eau · licence: Open use
Source file: https://ge.ch/sitg/geodata/SITG/OPENDATA/LCE_RAE_ACTIONS_PLANIFICATIONS-CSV.zip · the dataset
| Column | Type | Description |
|---|---|---|
| Object ID | INTEGER | Unique identifier for the record. |
| Measure Code | TEXT | Alphanumeric code identifying the specific water measure. |
| Measure Name | TEXT | Descriptive name of the planned action. |
| Main Water Basin | TEXT | The primary water basin or river affected (e.g., Rhône, Arve). |
| Municipalities | TEXT | The municipalities where the action is located. |
| Adopted By | TEXT | The authority that adopted the action (e.g., State or Municipality). |
| Adoption Date | DATE | The date the action was officially adopted. |
| Action Category | TEXT | The broad category of the action, such as water protection or evacuation. |
| Planning Type | TEXT | The planning tool used (e.g., SPAGE, PREE, PGEE). |
| Challenges | TEXT | The environmental or technical challenge being addressed. |
| Objectives | PLACE | The intended goal of the action. |
| Action Type | TEXT | The nature of the work, such as rehabilitation or planning. |
| Priority | TEXT | The timeframe for implementation (e.g., Short term 1-3 years). |
| Study Status | TEXT | Current progress of the preparatory studies. |
| Implementation Status | TEXT | Current progress of the physical implementation. |
| Implementing Body | TEXT | The entity responsible for carrying out the work. |
| Estimated Cost | PLACE | Estimated cost of the action, typically in CHF excluding tax (HT). |
| Fact Sheet Link | URL | URL to the detailed technical fact sheet. |
| Area | FLOAT | The geographic area associated with the action. |
| Length | FLOAT | The geographic length associated with the action. |
Query it in SQL · API · Use it from an AI agent (MCP) · More tables
Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.