Construction Investments and Work Backlog by Type and Canton (2017-2018)

This table provides data on construction investments for 2017 and the projected work backlog for 2018 across various Swiss cantons and regions. It distinguishes between civil engineering (Tiefbau) and building construction (Hochbau). Measures include total investment amounts in millions of Swiss francs, percentage changes from the previous year, and the share of the total.

This table is useful for analyzing regional trends in the Swiss construction industry and comparing civil engineering versus building construction. It does not provide a breakdown of specific project types (e.g., residential vs commercial) or data for years other than 2017 and 2018.

33 rows · 13 columns · published by Federal Statistical Office · licence: Open use, source must be named

Source file: https://dam-api.bfs.admin.ch/hub/api/dam/assets/36708455/master · the dataset

Columns

ColumnTypeDescription
Canton or RegionTEXTThe name of the Swiss canton or the larger regional grouping.
Civil Engineering Investments 2017FLOATInvestment in civil engineering for 2017 in millions of Swiss francs.
Civil Eng. 2017 % ChangeFLOATPercentage change in civil engineering investments compared to the previous year.
Civil Eng. 2017 % ShareFLOATThe share of civil engineering investments as a percentage of the total.
Civil Eng. Work Backlog 2018FLOATProjected work backlog for civil engineering in 2018 in millions of Swiss francs.
Civil Eng. Backlog % ChangeFLOATPercentage change in the civil engineering work backlog compared to the previous year.
Civil Eng. Backlog % ShareFLOATThe share of the civil engineering work backlog as a percentage of the total.
Building Construction Investments 2017FLOATInvestment in building construction for 2017 in millions of Swiss francs.
Building Const. 2017 % ChangeFLOATPercentage change in building construction investments compared to the previous year.
Building Const. 2017 % ShareFLOATThe share of building construction investments as a percentage of the total.
Building Const. Work Backlog 2018FLOATProjected work backlog for building construction in 2018 in millions of Swiss francs.
Building Const. Backlog % ChangeFLOATPercentage change in the building construction work backlog compared to the previous year.
Building Const. Backlog % ShareFLOATThe share of the building construction work backlog as a percentage of the total.

Questions it answers

Query it in SQL · API · Use it from an AI agent (MCP) · More tables

Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.