This table provides estimated requirements for electric vehicle charging points per municipality in Switzerland for the year 2030. It details the number of required charging points across different scenarios, including home, work, neighborhood, destination, and fast-charging options. Measures are broken down by charging type (AC/DC) and power output (kW).
This table is useful for urban planners and energy providers to estimate the necessary expansion of EV infrastructure by 2030. It focuses specifically on the 'Convenient' (Bequem) scenario and does not include data for the 'Planned' or 'Flexible' scenarios, nor does it provide actual current installation numbers.
2,202 rows · 20 columns · published by Swiss Federal Office of Energy · licence: Open use, source must be named
Source file: https://data.geo.admin.ch/ch.bfe.ladebedarfswelt/ladebedarfswelt/ladebedarfswelt-ladepunk… · the dataset
| Column | Type | Description |
|---|---|---|
| ID | INTEGER | Unique identifier for the record. |
| Geometry | TEXT | Geometric representation of the municipality boundary. |
| Municipality ID | INTEGER | Official identification number of the municipality. |
| Municipality Name | PLACE | Name of the Swiss municipality. |
| District ID | INTEGER | Official identification number of the district. |
| District Name | PLACE | Name of the district. |
| Canton ID | INTEGER | Official identification number of the canton. |
| Canton Name | PLACE | Name of the Swiss canton. |
| Canton Abbreviation | TEXT | Two-letter abbreviation of the canton. |
| Year | INTEGER | The reference year for the projection, 2030. |
| Charging Scenario | TEXT | The specific charging demand scenario, here 'Bequem' (Convenient). |
| Publicly Accessible Points | FLOAT | Total number of generally accessible charging points required. |
| Work AC Points | INTEGER | Number of AC charging points required at workplaces. |
| Neighborhood DC 150kW Points | FLOAT | Number of 150kW DC charging points required in residential neighborhoods. |
| Neighborhood AC Points | INTEGER | Number of AC charging points required in residential neighborhoods. |
| Fast DC 150kW Points | FLOAT | Number of 150kW DC fast-charging points required. |
| Fast DC 350kW Points | FLOAT | Number of 350kW DC fast-charging points required. |
| Destination DC 50kW Points | INTEGER | Number of 50kW DC charging points required at destinations. |
| Destination AC Points | INTEGER | Number of AC charging points required at destinations. |
| Home AC Points | INTEGER | Number of AC charging points required for home use. |
Query it in SQL · API · Use it from an AI agent (MCP) · More tables
Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.