This table provides projected numbers of electric vehicle charging points for the year 2025 across Swiss municipalities under the 'Planned' scenario. It details charging needs broken down by location (home, work, neighborhood, destination, fast charging) and technical specifications (AC/DC and power in kW). Data is aggregated at the municipality, district, and canton levels.
This table is useful for urban planners and energy providers to estimate the necessary EV charging infrastructure per municipality. It does not contain actual installed charging points, only projected needs based on a specific 'Planned' scenario. It cannot provide real-time availability of chargers.
2,202 rows · 20 columns · published by Swiss Federal Office of Energy · licence: Open use, source must be named
Source file: https://data.geo.admin.ch/ch.bfe.ladebedarfswelt/ladebedarfswelt/ladebedarfswelt-ladepunk… · the dataset
| Column | Type | Description |
|---|---|---|
| ID | INTEGER | Unique identifier for the record. |
| Geometry | TEXT | Geometric representation of the municipality boundary. |
| Municipality ID | INTEGER | Numerical identifier for the municipality. |
| Municipality Name | PLACE | Name of the Swiss municipality. |
| District ID | INTEGER | Numerical identifier for the district. |
| District Name | PLACE | Name of the district. |
| Canton ID | INTEGER | Numerical identifier for the canton. |
| Canton Name | PLACE | Name of the canton. |
| Canton Abbreviation | TEXT | Two-letter abbreviation of the canton. |
| Year | INTEGER | The reference year, which is 2025 for this table. |
| Charging Scenario | TEXT | The planning scenario used, here 'Geplant' (Planned). |
| Public Charging Points | FLOAT | Total number of generally accessible charging points required. |
| Work AC Points | INTEGER | Number of AC charging points required at workplaces. |
| Neighborhood DC 150kW Points | FLOAT | Number of 150kW DC charging points required in neighborhoods. |
| Neighborhood AC Points | INTEGER | Number of AC charging points required in neighborhoods. |
| Fast DC 150kW Points | FLOAT | Number of 150kW DC fast charging points required. |
| Fast DC 350kW Points | FLOAT | Number of 350kW DC fast charging points required. |
| Destination DC 50kW Points | INTEGER | Number of 50kW DC charging points required at destinations. |
| Destination AC Points | INTEGER | Number of AC charging points required at destinations. |
| Home AC Points | INTEGER | Number of AC charging points required for home charging. |
Query it in SQL · API · Use it from an AI agent (MCP) · More tables
Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.