This table provides projected numbers of electric vehicle charging points for the year 2030 across Swiss municipalities under the 'Planned' (Geplant) scenario. It details the required number of charging points categorized by location (home, work, neighborhood, destination, fast charging) and technical specifications (AC/DC and power in kW). The data is aggregated at the municipality, district, and canton levels.
This table is useful for urban planners and energy providers to estimate the future demand for EV charging infrastructure in Switzerland. It does not contain actual current installations, only projections based on the 'Planned' scenario, nor does it provide specific street-level locations.
2,202 rows · 20 columns · published by Swiss Federal Office of Energy · licence: Open use, source must be named
Source file: https://data.geo.admin.ch/ch.bfe.ladebedarfswelt/ladebedarfswelt/ladebedarfswelt-ladepunk… · the dataset
| Column | Type | Description |
|---|---|---|
| ID | INTEGER | Unique identifier for the record. |
| Geometry | TEXT | Geometric representation of the municipality boundary. |
| Municipality ID | INTEGER | Numerical identifier for the municipality. |
| Municipality Name | PLACE | Name of the Swiss municipality. |
| District ID | INTEGER | Numerical identifier for the district. |
| District Name | PLACE | Name of the district. |
| Canton ID | INTEGER | Numerical identifier for the canton. |
| Canton Name | PLACE | Name of the canton. |
| Canton Abbreviation | TEXT | Two-letter abbreviation of the canton. |
| Year | INTEGER | The projection year, which is 2030 for this table. |
| Charging Scenario | TEXT | The planning scenario used, here 'Geplant' (Planned). |
| Public Charging Points | FLOAT | Total number of generally accessible charging points required. |
| Work AC Points | INTEGER | Number of AC charging points required at workplaces. |
| Neighborhood DC 150kW Points | FLOAT | Number of 150kW DC charging points required in neighborhoods. |
| Neighborhood AC Points | INTEGER | Number of AC charging points required in neighborhoods. |
| Fast DC 150kW Points | FLOAT | Number of 150kW DC fast charging points required. |
| Fast DC 350kW Points | FLOAT | Number of 350kW DC fast charging points required. |
| Destination DC 50kW Points | INTEGER | Number of 50kW DC charging points required at destinations. |
| Destination AC Points | INTEGER | Number of AC charging points required at destinations. |
| Home AC Points | INTEGER | Number of AC charging points required for home use. |
Query it in SQL · API · Use it from an AI agent (MCP) · More tables
Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.