This table provides estimated requirements for electric vehicle charging points across Swiss municipalities for the year 2025 under the 'Flexible' scenario. It details the number of required charging points categorized by location (home, work, neighborhood, destination, fast charging) and technical specifications (AC/DC and power in kW). The data is aggregated at the municipality, district, and canton levels.
This table is useful for urban planning and infrastructure development to determine where EV charging stations should be placed to meet future demand. It does not contain actual existing charging points, only the estimated requirements based on the 'Flexible' scenario.
2,202 rows · 20 columns · published by Swiss Federal Office of Energy · licence: Open use, source must be named
Source file: https://data.geo.admin.ch/ch.bfe.ladebedarfswelt/ladebedarfswelt/ladebedarfswelt-ladepunk… · the dataset
| Column | Type | Description |
|---|---|---|
| ID | INTEGER | Unique identifier for the record. |
| Geometry | TEXT | Geometric representation of the municipality boundary. |
| Municipality ID | INTEGER | Official identification number of the municipality. |
| Municipality Name | PLACE | Name of the Swiss municipality. |
| District ID | INTEGER | Official identification number of the district. |
| District Name | PLACE | Name of the district. |
| Canton ID | INTEGER | Official identification number of the canton. |
| Canton Name | PLACE | Name of the canton. |
| Canton Abbreviation | TEXT | Two-letter abbreviation of the canton. |
| Year | INTEGER | The reference year for the data, which is 2025. |
| Charging Scenario | SWIFT | The specific charging demand scenario, here 'Flexibel'. |
| Public Charging Points Total | FLOAT | Total number of generally accessible charging points required. |
| Work AC Points | INTEGER | Number of AC charging points required at workplaces. |
| Neighborhood DC 150kW Points | FLOAT | Number of 150kW DC charging points required in neighborhoods. |
| Neighborhood AC Points | INTEGER | Number of AC charging points required in neighborhoods. |
| Fast DC 150kW Points | FLOAT | Number of 150kW DC fast charging points required. |
| Fast DC 350kW Points | FLOAT | Number of 350kW DC fast charging points required. |
| Destination DC 50kW Points | INTEGER | Number of 50kW DC charging points required at destinations. |
| Destination AC Points | INTEGER | Number of AC charging points required at destinations. |
| Home AC Points | INTEGER | Number of AC charging points required for home use. |
Query it in SQL · API · Use it from an AI agent (MCP) · More tables
Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.