This table contains 123 spatial points representing elements of the cantonal structure plan for the Canton of Schaffhausen, Switzerland. Each row identifies a specific site, such as material extraction pits (e.g., clay or limestone) or archaeological sites, including their legal status and approval dates. The data covers planning revisions and approvals from 2014 to 2021.
This table is useful for urban planners, environmentalists, and historians tracking land-use designations and protected sites in Schaffhausen. It provides legal timelines and spatial references but does not contain detailed geological data or the full descriptive text of the planning laws.
123 rows · 14 columns · published by Planungs- und Naturschutzamt · licence: Open use
Source file: https://data.geo.sh.ch/ogd/richtplan.zip · the dataset
| Column | Type | Description |
|---|---|---|
| ID | INTEGER | Unique integer identifier for the record. |
| Geometry | TEXT | Geometric coordinates of the point in MULTIPOINT format. |
| UUID | UUID | Universally unique identifier for the spatial object. |
| Site Name | TEXT | The name of the specific site or business, such as 'Lohn Kalk-Steinbruch'. |
| Structure Plan Number | TEXT | The reference number assigned within the structure plan. |
| Subject Area | TEXT | The general subject area, such as 'Materialabbau' (Material Extraction) or 'Archäologische Fundstelle' (Archaeological Site). |
| Chapter | TEXT | The specific chapter of the plan the site belongs to. |
| Theme | TEXT | The thematic category, such as 'Landschaft' (Landscape) or 'Naturschutz' (Nature Conservation). |
| Coordination Status | TEXT | The current status of the planning coordination, e.g., 'Festsetzung' (Fixation) or 'Zwischenergebnis' (Intermediate Result). |
| Link to Plan Text | URL | URL leading to the full text of the structure plan for that entry. |
| Issued by Government Council | DATE | Date the measure was issued by the Government Council. |
| Approved by Cantonal Council | DATE | Date the measure was approved by the Cantonal Council. |
| Approved by Confederation | DATE | Date the measure was approved by the Swiss Confederation. |
| Plan Revision | TEXT | The name of the revision cycle, such as 'Richtplananpassung 2020'. |
Query it in SQL · API · Use it from an AI agent (MCP) · More tables
Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.