Switzerland Electricity Distribution Grid Investment Costs

This dataset provides projected investment costs for electricity distribution grids in Switzerland up to 2050, based on Energy Perspectives 2050+ scenarios. Each row represents investment needs for a specific year, scenario, grid level, and cost subtype. The data is broken down by model network types, including the whole of Switzerland, large urban, rural, and peri-urban municipalities.

This table is useful for urban planners and energy policymakers to estimate the financial impact of electromobility, heat pumps, and photovoltaics on the power grid. It provides high-level projections based on scenarios rather than actual historical spending. It does not contain specific geographic coordinates for individual grid assets or operational maintenance costs.

3,348 rows · 8 columns · published by Bundesamt für Energie BFE · licence: Open use, source must be named

Source file: https://www.uvek-gis.admin.ch/BFE/ogd/113/ogd113_investitionskosten.csv · the dataset

Columns

ColumnTypeDescription
YearINTEGERThe calendar year of the projection.
Main ScenarioSTRINGThe energy scenario used for the calculation (e.g., WWB).
SensitivityNULLSensitivity analysis parameter, if applicable.
Model NetworkTEXTThe type of network area, such as 'Ganze Schweiz' (Whole Switzerland) or 'Ländliche Gemeinden' (Rural Municipalities).
Grid LevelTEXTThe grid level identifier (e.g., NE 2 to NE 7).
WACC PercentageFLOATWeighted Average Cost of Capital expressed as a percentage.
Cost SubtypePLACEThe category of investment: network expansion, replacement of existing assets, or capacity expansion.
Investment Costs (Real CHF)INTEGERThe projected investment cost in real Swiss Francs (CHF) at 2020 prices.

Questions it answers

Query it in SQL · API · Use it from an AI agent (MCP) · More tables

Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.