This dataset provides projected investment costs for electricity distribution grids in Switzerland up to 2050, based on Energy Perspectives 2050+ scenarios. Each row represents investment needs for a specific year, scenario, grid level, and cost subtype. The data is broken down by model network types, including the whole of Switzerland, large urban, rural, and peri-urban municipalities.
This table is useful for urban planners and energy policymakers to estimate the financial impact of electromobility, heat pumps, and photovoltaics on the power grid. It provides high-level projections based on scenarios rather than actual historical spending. It does not contain specific geographic coordinates for individual grid assets or operational maintenance costs.
3,348 rows · 8 columns · published by Bundesamt für Energie BFE · licence: Open use, source must be named
Source file: https://www.uvek-gis.admin.ch/BFE/ogd/113/ogd113_investitionskosten.csv · the dataset
| Column | Type | Description |
|---|---|---|
| Year | INTEGER | The calendar year of the projection. |
| Main Scenario | STRING | The energy scenario used for the calculation (e.g., WWB). |
| Sensitivity | NULL | Sensitivity analysis parameter, if applicable. |
| Model Network | TEXT | The type of network area, such as 'Ganze Schweiz' (Whole Switzerland) or 'Ländliche Gemeinden' (Rural Municipalities). |
| Grid Level | TEXT | The grid level identifier (e.g., NE 2 to NE 7). |
| WACC Percentage | FLOAT | Weighted Average Cost of Capital expressed as a percentage. |
| Cost Subtype | PLACE | The category of investment: network expansion, replacement of existing assets, or capacity expansion. |
| Investment Costs (Real CHF) | INTEGER | The projected investment cost in real Swiss Francs (CHF) at 2020 prices. |
Query it in SQL · API · Use it from an AI agent (MCP) · More tables
Cleaned and typed by Data Cleaner: open this file in Data Cleaner or clean your own file.